
Building clay
Building clay for clay mortar mixtures and clay plaster recipes, available as sacked goods (dr…

SKU: 04.004| EAN: 4042356040046
Gross price incl. 19 % VAT(0,30 €/kg)
Straw clay earth-moist, traditional clay building!
Volume discount for full pallets
Deducted automatically in the basket.
plus 1 × 25,00 € refundable EUR pallet deposit
Big bag on Euro pallet
Straw clay is set rich. Prepare it into a plastic building material, depending on consistency, with approx. 10–15 % water in a pan or trough forced-action mixer, ideally in a lifting kneader or dough kneading machine; small quantities in mortar tubs with a spade, rake or strong power whisk. Timber frame infill: throw on or push through from outside onto wattle or a stave lattice, fold over and smooth the beads on the inside; after 1–2 days of initial drying, smooth over the whole surface inside. Roughen the outside carefully while fresh for the lime plaster (punch holes). Ceilings: apply straw clay to the staves, push through to the plaster base (reed mesh St 70, 34.001), compact lightly and level flush with the top of the beams. Panel repair: sweep and wet the panel, fill large defects, then apply 20–30 mm thick over the whole surface; set back 15 mm from the outer face of the beams. With lean, sandy old clay, lean the mix with sand; make a work sample. Exterior plaster with coarse lime base plaster with hair (21.200).
Store dry. Use earth-moist straw clay at the latest 3 months after production. In winter store protected from freezing through, otherwise workability is impaired during frost.
A 1,0 t big bag of earth-moist raw mass makes 700 l of ready-to-use straw clay mass. When calculating material requirements, deduct the volume of the wattle or the ceiling staves for a 8,0 cm thick component at approx. 20–25 %. For stave ceilings, the timber portion (beams) is measured over; calculate with sufficient reserve.
Building clay up to 5 mm, sand 0–8 mm, barley straw up to 10 cm
| Fibre length | Barley straw up to 10 cm |
| Grain size | 0 to 8 mm |
| Scope of delivery | 1,0t big bag · special production |
| Bulk density | 1.600 kg/m³ |
| Coverage (litres) | 700 l |
| Areas of application | Repair and new construction of clay infills in timber frame renovation · clay fillings of historic timber beam ceilings · 700 l of ready-to-use straw clay per big bag · traditional clay building |
| μ value (diffusion resistance) | 5/10 |
| Area of application | Repair and new construction of clay infills in timber frame renovation; clay fillings of historic timber beam ceilings |
| Special feature | Special production |
| Bulk density | 1.600 kg/m³ |
| Yield | approx. 700 litres of plastic straw clay per big bag |
| Material classification | Straw clay (SL) according to 3.4 of the clay building rules of the Dachverband Lehm |
| Storability (months) | 3 months |
| Thermal conductivity λD | 0,73 |
| Water addition | approx. 10–15 % water, depending on the desired consistency |
To go with it: my free clay building diary with drying log.
Download free of chargeFurther expert knowledge
Straw clay and its use in timber frame construction are explained in the article Clay building: building and renovating with clay.
Panel infill with straw clay in timber framing is explained in the article Filling a timber frame panel: definition, materials and step-by-step guide.