Using straw clay, rammed earth and clay fills in timber framing and old buildings

Straw clay, light clay, rammed earth or fill: what goes where

You use straw clay to repair and newly build clay infills and for clay fillings of historic timber joist ceilings. You lay clay-wound staves of oak heartwood, clay and rye straw into ceiling bays. Dry clay fill fills cavities between sleepers and beams; the light clay-wood dry fill additionally provides thermal and sound insulation and also fills screed honeycombs in dry construction.

Expanded clay light clay is intended for insulating facing leaves in timber frame and old buildings. It is not suitable as a fill between vertical masonry leaves, because damage-free drying cannot be guaranteed there. You install rammed earth for walls in formwork, and rammed earth natural fine for the top layers of rammed earth floors.

Hemp shives are an aggregate for hemp-lime plasters, light clay mixes and loose-fill insulation in cavities. ISOCANNA fine is intended for lime-hemp plasters indoors; as binder for this, Saint-Astier names among others NHL 2, which I stock with the lime plasters.

Repairing timber framing with straw clay and clay joint filler

Make straw clay plastic with about 10–15 % water in a compulsory mixer. For a panel repair, sweep the panel, moisten it, fill large defects and then apply 20–30 mm over the whole area. Leave a 15 mm set-back from the outer beam surface, and roughen the outside while fresh for the later lime plaster. If the old clay is lean and sandy, make the straw clay leaner with sand and make a work sample.

With clay joint filler you close joints between timber frame beams and clay infill, timber shrinkage cracks and plug holes. You fill it into the refill cartridge, strike it off with a silicone spatula and smooth it with a fine brush and water. It is not intended for joints between lime plaster and timber frame beams.

Tips

  • Use earth-moist straw clay at the latest 3 months after production and protect it from freezing through in winter.
  • Joint filler natural brown suits natural-coloured interior plasters, natural light suits white and light ones.
  • Install clay-wrapped staves immediately after delivery so that the residual moisture dries out.

Installing fills, light clay and rammed earth

For ceiling fills, carry out the trickle protection carefully. Apply the dry clay fill at least 60 mm high; if necessary, compact the light clay-wood fill in layers of 10 cm by light vibration. Before laying the walking surface layer, check the material moisture by hand or visual test.

Fill expanded clay light clay behind permanent formwork of reed mesh; the grid of the substructure is at most 35 cm; clay boards are not permitted as permanent formwork. Compact it with simple tools until the leaf is filled without cavities, and do not tamp it. Fill rammed earth into stable formwork in layers 100–150 mm thick and compact it to the maximum. Load-bearing rammed earth walls are planned according to the clay building rules of the Dachverband Lehm and built only under the supervision of an experienced specialist. Rammed earth is water-soluble and needs weather protection.

Tips

  • For rammed earth floors, plan a total build-up of at least 100 mm on concrete and 160 mm on soil or insulation.

Clay building materials installed moist dry out

After installing moist clay building materials, ensure rapid drying, with cross-ventilation where all windows and doors stay open day and night, or with drying equipment. For expanded clay light clay, ClayTec states a minimum drying time of 15–8 weeks for a 12 cm drying depth on one side; if mould appears on its surface, speed up drying immediately. You may only plaster or clad it once drying is largely complete. Straw clay must be completely dry before plastering.

Frequently asked questions

Can I mix mortar or plaster myself with building clay?

ClayTec intends building clay as a raw material for craftsmen with experience in clay construction; you develop the recipe yourself depending on purpose and aggregate. Depending on use, there are 1–0,5 parts by volume of aggregate to 2,5 part by volume of clay. If you want to work without your own recipe, you will find ready-matched clay plasters and clay masonry mortar in their own categories.